Shenzhen bm cleanroom systems Engineering&Equipment co.,ltd.
TEL:
0755-28028756
0769-87777509
LINKER:
Mr.Lu
Mobile:
15989856155
Email:
Add:NO.233,Henan Village,Songyuan Community,Guanlan Street,Longhua District,Shenzhen City.
Office address: No. 1703, Building 1, Jingdong Zhigu, Fenggang Town, Dongguan City
The matters needing attention in the operation process of the clean workshop:
1 when the production work is stopped, the exhaust cabinet should reduce the exhaust air volume, and the fresh air volume should be adjusted accordingly.
2 according to different process should be able to effectively control the number of indoor air ventilation.
3 whether the transition season to increase the fresh air ratio, as well as the duty to run the operation mode is ahead of the operation should be determined by economic comparison.
4 to improve the level of automatic control of air conditioning system, can achieve both to ensure the quality of operation, but also to achieve the purpose of energy saving.
Bag feeding tube
Process piping
Clean pipeline project of food and beverage shop
Food and beverage clean aseptic production workshop